SECURITY FORCES MEDICAL CITY (SFMC)
Jeddah, KSA
The Security Forces Medical City is one of the largest medical investments in the GCC. The total area of the city is almost 2.5 million m2 of which the hospital is nearly 500.000 m2.
​
Airdeck was selected as the lightweight floor system for the hospital building. Flexibility in the project was very important and Airdeck came up with a tailor made drilling protocol to allow future drillings in the hospital building structure.
​
The project is currently under construction and over 350.000 m2 of Airdeck panels will be delivered.
Images of the project
More information?
Feel free to contact us
Lower reinforcement (including lattice girders) for the Airdeck elements is prepared in the factory | The slab of 7cm is poured in the factory in Riyadh | Airboxes are correctly positioned in the freshly poured concrete |
---|---|---|
Curing process of the Airdeck elements | Ready for transport. The elements can be stacked on top of each other. | Special frames underneath the stack of plates make sure a safe transport can be done |
The lifting points are indicated for the contractor | Special crosses are installed between the planks to make sure no cracks can occur | Lifting at the construction site in Jeddah |
Unloading can be done by only a few workers. | A stock can be build at the construction site if desired | Each element has a unique identification number |
Lifting of the elements with a 8-points lifting system | Installation of the elements on temporary supports | Fast and secure installation |
Once the elements are installed, the upper reinforcement works can start | The elements (and even the Airboxes) are safe to walk on | Upper reinforcement is ready. The floor can be poured with concrete. |
Concrete pouring. Less concrete is needed because of the airboxes (void formers). | Aerial view: different stages of construction can be combined | Aerial view: upper reinforcement can be installed on the elements on top |
Aerial view: different stages are visible (preparation of temporary supports, upper reinforcements, finished areas, ...) | Aerial view: floors are ready to be poured with concrete | Aerial view: concrete works in progress |
Bottom view: temporary supports | Bottom view: temporary supports are being removed | Bottom view: the floor is finished |
Bottom view: the floor is finished |